top of page
283.jpg

Pool Construction Info

724.jpg

Choosing the right pool company can be confusing so we came up with a list of construction items that makes Oasis Pools stand out from the rest.

  • Pool design, layout and complete construction management by owner Mike Sr., Michael Jr. or Nick Stanton.

  • 1 or more skimmer(s) per pool.

  • 2 bottom main drains for pools & spas.

  • 3/8” steel tied 10” on center.

  • Spa walls, which are not shared with the pool, are doubled to increase strength. This is called a “double curtain."

  • 4" Limestone base under pool floor instead of river rock.  This makes for a much more solid foundation and allows water flow beneath the pool.

  • True gunite, not concrete/shotcrete, is used to assure total security of you asset.  Unlike vinyl or fiberglass pools, a gunite pool floor and walls form a single entity which means there are no rupture points and pressure is uniformly distributed.

new pool project
Oasis logo

CONTACT

985-796-POOL
504-475-POOL


 

FOLLOW US

  • Instagram
  • Facebook
  • TikTok

© 2026 by Oasis Pools & Spas, LLC. Designed by Trellis Marketing.

bottom of page